There are two DN100 diameter chilled water pipes with insulation cotton failure and leakage from the passage beside the control room at the A end of Tianhe Passenger Transport Station on Guangzhou Metro Line 3 to the turning point. The length of the pipes is about 40m. One of the pipes was selected as a pilot, and aerogel blanket was used to replace and renovate the insulation cotton. After the replacement was completed, the condensation problem was completely resolved.