The cool storage room on the 6th floor of a certain tertiary hospital in Shenzhen is responsible for the low-temperature storage of medicines, reagents and other materials, and the temperature needs to be maintained at 18℃ all year round. Due to the lack of insulation measures in the existing space, condensation water and mold have formed in the adjacent rooms and the wards downstairs. The moldy areas need to be covered with topcoat every three to four months, which not only increases the maintenance costs of the hospital but also has a negative impact on the environmental quality of the wards.
Global Leader in Aerogel Materials & Advanced Composite Solutions
Back to Top
Copyright © 2025 Shenzhen Aerogel Technology Co., Ltd.
Power By Bontop